Case Study
Motorway bridge SHM
Motorway bridge SHM Client Transport Research Laboratory Ltd and UK Highways Agency. Challenge Monitoring of strain, displacement and temperature on a post-tensioned concrete bridge constructed in the late 1960s. The bridge forms part of the UK’s motorway network and carries slip road tra?c at a busy intersection. The sensor system is being used to monitor the behaviour of the bridge following recent remedial works. Resolution The bridge is to be continuously monitored for a multi-year period using a network of 84 displacement sensors, 48 strain sensors, and several temperature sensors. Sensors were ?xed both to the bridge deck and so?t. The sensors on the bridge deck were ?xed in place, prior to the road surface being re-laid. Data is transmitted via a DSL connection to a remote w