Case Study
Modification To A 3-Stage Filtration System In Malaysian Power Plant
REFERENCE From the field: modification to a 3-stage filtration system in Malaysian power plant F?45?S Introduction The project was to convert the air intake housing from a cartridge to a static filter system. The 350 MW combined-cycle power station is located in Malaysia, running a GE Frame 9 FA turbine. Situation The air intake housing was initially fitted with competitor products covering 456 prefilter panels of filter class G?4 and 3