Case Study

Modernizing Power in Poland

Modernizing Power in Poland

Pages 8 Pages

Modernizing Power in Poland Reprint from World Cement January 2006REPRINTED FROM WORLD CEMENT January 2006 2 Introduction Since Cementownia Kujawy became a member of the Lafarge group in the 1990s, it has been modern- ised in several stages. One of the biggest steps was the construction of the 4500 tpd dry kiln line, which replaced the three existing wet kiln lines. This project extended from receipt of raw material from the quarry to trans

Join for free to read