Case Study

Mobile River I-10 Bridge Study | Volkert

Mobile River I-10 Bridge Study | Volkert

Pages 2 Pages

Mobile River I-10 Bridge Study | Volkert Location: Mobile, AL Client: Alabama Department of Transportation (ALDOT) The Alabama Department of Transportation selected Volkert to prepare feasibility and environmental studies and other preliminary assessments and plans for the construction of a new, six-lane bridge and the widening of the existing I-10 Bayway across Mobile Bay to alleviate severe congestion and overuse of the current I-10 Mobile River crossing, the Wallace Tunnel. Volkert’s services include engineering and environmental studies as well roadway alignments, bridge design concepts, functional design, and construction cost estimates. Volkert has also conducted traffic studies, including an origin- destination study, traffic counts, traffic projections, benefit/cost ratio, capacity

Join for free to read