THE PIRBRIGHT INSTITUTE Client: British Bio-medical Research Council (BBmRC) Commencement Date: October 2013 Programme: 11 Weeks Project Value: £1 ’276 ’026.00 The Pirbright Institute, Pirbright, Surrey The Pirbright Institute AECOM Undertook a survey and this result determined that approximately 25,341.50m 3 of material required processing and removal from site by January 2014. The works were to be carried out in accordance with the Bio-security Soils Protocol (ref. BSEC-CON-02), where applicable the CL:AIRE Code of Practice, and all other licenses, exceptions and permits issued by the Local Authority or other statutory bodies. Storefield identified an appropriate receiver site for materials classified under the waste code 17 05 04 - stones and soils as