Case Study

Middle East Installation Employs Brine Concentrator

Middle East Installation Employs Brine Concentrator

Project Overview The remote Qarn Alam site, located about 350 km south- west of Muscat, presented several challenging problems. Make-up water was extremely unsuitable and of limited supply. In addition, Oman’s stringent environmental constraints re- quired careful consideration. Another important point was that the operators had limited experience with evapora- tion equipment, so a simple, reliable system was necessary. The Facility Petroleu

Join for free to read