Genwest Silverhawk Power Plant in Nevada to Install Brine Concentrator System
Project Overview In accordance with the State of Nevada and Clark County’s strict environmental compliance requirements, this facility is permitted as a Zero Liquid Discharge (ZLD) unit. Though the facility is based on dry cooling arrangement, liquid waste is generated from the demineralizer system and other day-to-day plant operations. The generating sta- tion needed to treat 60 gpm wastewater on a continuous basis from the power generatin