- - - - SUMMARY OF GAINS -- ENERGY MANAGEMENT SYSTEM ------SEL - 2012-13 S No. DIVISION SOURCE TANGIBLE GAINS F13 SAVING (Rs. LAC) SAVINGS/ANNUM (Rs. LAC) 1 SERVICE BLOCK PEAK LOAD 3.92 47.04 OPTIMIZATION OF DG SETS 7.63 13.06 2 CAPACITOR BANK POWER FACTOR 1.25 1.99 3 UTILITIES CANTEEN 0.64 0.96 SHOP INCLUDING AC'S 2.24 2.24 4 WATER ETP 0.04 0.04 ENGINE TESTING 0.4 0.4 5 SHOP REMOVAL OF EXHAUST FANS 5.07 5.07 ZERO ENERGY FANS TRANSLUCENT SHEET PAINT UNDER ROOFTOP 6 MACHINE SHOP LUBRICANTS/HYDRAULICS 19.53 19.53 7 SHOP & SERVICE BLOCK OPTIMIZATIONS OF COMPRESSORS 15.76 15.76 AIR LEAKAGES 4.72 4.