Case Study

Meijer Corporate Pedestrian Tunnel

Meijer Corporate Pedestrian Tunnel

Pedestrian Tunnel Owner: Meijer, Inc. Engineer: Prein & Newhof Contractor: Rockford Construction Technical Description: • 12’ Span x 11.5' Rise x 120' Length CON/SPAN ® B-Series Bridge System • 6.5' wide x 2' thick x 120' long EXPRESS ® Foundations Installation: July 2015 Founded in 1934, Meijer, Inc. is credited with pioneering the modern supercenter concept. As one of the largest private companies operating

Join for free to read