Case Study
Medical Research Facility
LUMEC CONTROL PRODUCTS , Inc. ® • 8400 North Allen Road • Suite B • Peoria • Illinois • 61615 309•691-IRIS (4747) • sales@irisvalve.com • www.IRISVALVE.com • Made in U.S.A. Installation The Continuous Combustion Control System™ (3CS) from Lumec Control Products was installed on a 150 HP Cleaver Brooks 4-pass scotch marine low emissions boiler operating in tandem with a second unit of the same size for supplying steam to a ste