Case Study

Harvard Medical Research Center

Harvard Medical Research Center

Pages 1 Pages

This 200-foot-tall research facility was constructed in the congested Longwood Medical Center directly adjacent to two research facilities. The deep excavation required a chiller vault because the facility required excavation below the belled-caisson and spread footing foundations supporting the adjacent buildings. Construction involved installation of cast-in-place concrete diaphragm slurry walls, prestressed pipe struts, and h

Join for free to read