Case Study
Medge Hall
Case Study: Medge Hall www.van-elle.co.uk 01773 580580 info@van-elle.co.uk Project Overview Network Rail has invested £10m at Medge Hall, near Doncaster to improve the ground to support the railway and remove a speed restriction following problems with drainage in soft peat that led to track instability. Work began at the beginning of June 2009 and possession was scheduled until the 27th July 2009. The improvement works required an 11 week full closure of the line between Doncaster and Scunthorpe, although operating restrictions meant that there were no trains between Doncaster and Clee- thorpes for the duration. Further work, worth an additional £10m was also completed along the line during this closure. Due to the difficult site access, working constraints and the desi