Massive Amounts Of Material Delivered To Reclamation Site In Just One Month And Installed In Extreme Temperatures.

Massive Amounts Of Material Delivered To Reclamation Site In Just One Month And Installed In Extreme Temperatures.

Pages 2 Pages

PROJECT CASE STUDY PROJECT CASE STUDY www.cetco.com Massive amounts of material delivered to reclamation site in just one month and installed in extreme temperatures. The Suncor Pond 1 is an oil sands tailings pond located near Fort McMurray, Alberta, Canada. This region experiences an average winter temperature of -19 °C, with a record low temperature of -50 °C. CHALLENGE: A reclamation cover needed to be installed that would act as a b