High Hydrostatic Conditions, Hundreds Of Slab Penetrations, Poor Site And Weather Conditions

High Hydrostatic Conditions, Hundreds Of Slab Penetrations, Poor Site And Weather Conditions

Pages 2 Pages

PROJECT CASE STUDY North America: 847.851.1800 | 800.527.9948 | www.CETCO.com CHALLENGE: High Hydrostatic conditions, hundreds of slab penetrations, poor site and weather conditions. SOLUTION: The Shady Hills School addition, a gym with a garage beneath it, was integrated into an existing structure 11 feet below the water table. The original specification called for ULTRASEAL below slab with a layer of VOLTEX DS installed over it to provide p