Case Study

Marine Division - Integrated Technology

Marine Division - Integrated Technology

The requirement A replacement system design for the precise time and frequency system (PTFS) equipment used was needed, using commercial off-the-shelf (COTS) equipment suitable for rapid installation through the class modi?cation process. This minimises the level of development required and enables the equipment to be ?tted during ?eet time, alleviating the obsolescence issues encountered with the existing system. Meeting the challenge Babcock d

Join for free to read