Case Study

Main Boiler Control Retrofits

Main Boiler Control Retrofits

Pages 2 Pages

TEXON Success story - Main boiler control retrofits Texon knows how to carry out a successful retrofit and has the track record to back it up. In 2009, Texon Automation was awarded the contract for retrofitting the boiler control system onboard four sister LNG/C: Al Khaznah, Shahamah, Ish and Ghasha owned by National Gas Shipping Co. (NGSCO). The order was placed only 7 months before the first vessel’s scheduled dry docking (mid October 20

Join for free to read