Case Study

Sonic Cleaning

Sonic Cleaning

Pages 2 Pages

m/v SEAGARD, BROR HUSELL CHARTERING AB LTD Installation of 2pc IKT230/175 sonic horns in PWT exhaust gas boiler. Problems reported: The Exhaust Gas Boiler must be water washed by injecting water in the bottom of the boiler approximately 3 times per week to maintain steady thermal oil temperature required for ships heating systems. When spraying water into the EGB soot flake buildups accumulated is loosened from the boiler internal spread upon dec

Join for free to read