Case Study
Madison Park Village – Building 10 Addition
Project DescriPtion Improvements to the existing buildings at Madison Park Village included construction of a new 1,640 square foot addition. The addition was designed on a pile-supported mat foundation with a total load of 1,300 kips. Nine piles with working capacities of 110 to 190 kips were specified. Geotechnical conDitions A site-specific boring performed encountered variable “urban” fill consisting of sand, gravel and clay along with b