IFT was contracted by the projects Principal Contractor, Robertson Construction, to provide screed and resin works at the new £140million Macallan Distillery and Visitor Centre that opened in June 2018. Production Areas 6,500 sqm of 6-9mm heavy duty, polyurethane resin floor screed was installed, as well as 3,000m of soft joints. The benefits of this material include it's very high chemical resistance, it's easy to clean and sterile anti-slip surface, it is heat resistant to 120°C, it is resistant to steam cleaning and constant hot water, and also it's positive slip resistance. There were however challenges to this application, such as working in and around the existing pipework. Visitor Centre 3,700 sqm of 75mm Isocrete HD K Screed fibre reinforced screed followed by 10