Case Study

M4 Junction 11, Reading

M4 Junction 11, Reading

Peter Brett (PBA) | M4 Junction 11, Reading Junction 11 of the M4 had become a bottleneck, causing congestion in and around the junction. Reading Borough Council appointed PBA as its project manager and designer on the £65 million scheme to improve traffic conditions for all users of the junction. The junction is Reading’s main traffic gateway, which meant the project had to be completed while keeping the junction open. A detailed acoustic model of the area was produced to assist in the planning application. PBA was able to provide solutions that reduced noise levels below the existing levels, leaving receptors in the vicinity of the site with a positive impact of lower noise levels than before development. The traffic capacity was maintained throughout peak periods and off-peak and evenin

Join for free to read