Case Study

LUNDY ISLAND, BOAT CAVE – CIVIL ENGINEERING

LUNDY ISLAND, BOAT CAVE – CIVIL ENGINEERING

John Grimes Partnership designed the stabilisation works that included rock bolting and reinforced sprayed concrete stabilisation within the cave and at the back of the actively receding rock mass wedge failure, as well as installing slope drainage. The rock bolted, reinforced, sprayed concrete was designed to form a sti tension skin integrated with the rock face. The slope stabilisation works were designed to limit the potential for futur