Case Study

LUL Nominees SSL Ltd

LUL Nominees SSL Ltd

Pages 3 Pages

Construction of a new hand-wash facility for LUL including strengthening to the existing shed, a new roof extension and raised access platforms to both sides. The works incorporated demolition, M&E (LVAC), P-Way with HVDC connection, RC slab construction and drainage work. Scope of the Works Dyer & Butler were commissioned to provide a new wash road facility at Hammersmith Station which was part of the wider London Underground Sub-

Join for free to read