Long term performance monitoring is a critical component of an asset management programme for dams.
Long term performance monitoring is a critical component of an asset management programme for dams. In 2005 ITM Monitoring, now SOCOTEC Monitoring UK Ltd, was approached by Halcrow, acting for Welsh Water, to assist in the design of an instrumentation system for Claerwen Dam in the Elan Valley. Summary of the Works Client: Welsh Water Contract name: Claerwen Dam Start date: August 2005 Completion date: Ongoing Monitoring system: tilt sensors, data logger, ARGUS Monitoring Software After several meetings with the asset engineer and a site visit to the dam, it was agreed that ITM Monitoring would supply and install 6nr tilt sensors and a data logger in the upper gallery of the dam to detect any movements of the dam caused by changes in temperature and water level. Due the remote location of