Case Study

ITM Monitoring, now SOCOTEC Monitoring UK Ltd, was invited to tender for an Arup designed monitoring scheme at the V&A Museum in 2013 and was awarded

ITM Monitoring, now SOCOTEC Monitoring UK Ltd, was invited to tender for an Arup designed monitoring scheme at the V&A Museum in 2013 and was awarded

Pages 2 Pages

ITM Monitoring, now SOCOTEC Monitoring UK Ltd, was invited to tender for an Arup designed monitoring scheme at the V&A Museum in 2013 and was awarded the sub-contract in January of 2014. Client: Wates Construction Duration: January 2014 – March 2016 Monitoring: 3D Prisms, BRE levelling studs, Precise levelling points, Crack Monitors, Vibration monitors, Noise monitors, Time lapsed photography, Pile duct inclinometers, Magnetic extensometers, Vibrating wire strain gauges, Argus Monitoring Software. Budget: Project total: £49m, Monitoring Scheme £337k The V&A museum is developing an area into a ceramic tiled courtyard, accessible from Exhibition Road, and a new entrance into the museum via the Western Ranges, with a new subterranean gallery beneath. The space previously utilised for low grad

Join for free to read