Case Study
London Underground Limited
Refurbishment of the London Underground Metropolitan Line underbridge between Northwood Hills and Northwood. The works comprised cleaning, concrete works, brickwork repairs and re-painting of the MR60 underbridge. Scope of the Works Structure MR60 is an underbridge located approximately 650 meters form Northwood Station and 850 metres from Northwood Hills Station. The bridge was erected in 1961 and has a skewed span of 49 linear m