Case Study

London Gateway

London Gateway

Pages 2 Pages

Looking after London Gateway’s land and engineering survey requirements on the inland “Park Side” of the site is Mark Humphrey of Land and Satellite Surveys (L&SS). The primary focus on the Park Side of the site is to prepare the area for roads, rail and buildings. L&SS is contracted to support the many divisions of London Gateway. On a daily basis Mark can undertake anything from setting-out and volumetric surveys to as-built surveys o

Join for free to read