Case Study
London Gateway
Contractor: Completion: VolkerFitzpatrick 2015 London Gateway Products used: Products used: 8,500 tonnes of Tufflex HD, 3,000 tonnes of Tufflex and 1,800 tonnes of Tuffpave Challenges: Challenges: Difficult ground conditions, extremely heavy axle loads and tight time scales Main contractor: Main contractor: VolkerFitzpatrick Completed: Completed: Spring 2015 London Gateway, the deep-water container port and logistics park, has been constructed