Case Study

London Borough of Redbridge, Lynton House

London Borough of Redbridge, Lynton House

Pages 1 Pages

London Borough of Redbridge, Lynton House CASE STUDY Propelair was selected by the London Borough of Redbridge to supply 45 units in Lynton House, Ilford. The installation of the water- and energy-saving toilets was carried out over eight floors and is now complete. Metered Water Charge Flushes Per Day Current Flush Volume Annual Savings Payback Water Financial £2.07/m3 33 11.31 l 118,161 l £244.59 1.9 yr TEL 01268 548 322 | EMAIL enqui

Join for free to read