Case Study: London 2012 Olympics Velodrome Lucy Zodion produce specialis equipped cabinet for London Velodrome Background As part of the preparations for the London Olympics 2012, a new Velodrome facility was consructed. The Velodrome required a safe method of supplying electricity within the facility. SolutionThere were some very specifc issues that had to be addressed as part of this project. Firsly, the architect had very specifc design requirements for how the electrical feeder pillar should look. It would be situated inside the Velodrome, inside walls located in the service tunnels. Secondly, as the Olympics were not going to be using electricity from the national grid but insead from its own locally generated separate supply, the pillar needed to be designed to facilitate this need.