Case Study
Locomotive Wash-down Area Re-aligned
PROJECT PROFILE Summary At the Downer EDI Rail facility in Port Augusta, South Australia, locomotives are overhauled and re-fitted. Prior to entering the workshop area they are washed down over a concrete slab area. As so often happens with vehicle wash-down areas, a subsidence problem had occurred caused by the ingress of water eroding the sub-base of the slabs. The slabs had subsided preventing the water from running off into the drains