Case Study

Airliner Wash-Down Area Re-Supported

Airliner Wash-Down Area Re-Supported

Pages 1 Pages

PROJECT PROFILE Summary At Sydney international airport the sub-base under 400m 2 of taxiway pavement slabs in the area used for washing-down 747s and other airliners had become water-eroded. The area was re-supported and re-levelled section by section by Uretek geopolymeric injections with no interference with airport activities. So successful and impressive was this project that we have been called in several times to do similar work at

Join for free to read