Case Study

LNG Major saves $135 million, reduces failures through Maintenance Strategy Optimization

LNG Major saves $135 million, reduces failures through Maintenance Strategy Optimization

Pages 3 Pages

This case study shows how an LNG producer partnered with ARMS Reliability to optimize maintenance strategies using RCM and PMO methodologies. ARMS identified 265 failure modes across turbines, pumps, and fin fans; eliminated over-maintenance; and redesigned PM programs. The optimized strategy cut high-cost failure classes by 20%, significantly reduced risk, and generated an estimated $135 million in 10-year savings through improved asset reliability, fewer corrective work orders, and better maintenance planning.

Join for free to read