Case Study
Lm 6000 Turbine Generator Power Plant
CHALLENGE LM 6000 TURBINE GENERATOR POWER PLANT In 2014, Patching Associates was retained by the City of Medicine Hat Electric Utility to conduct a Noise Impact Assessment (NIA) for the proposed LM6000 Turbine Generator facility. The project was awarded in June 2014 and the final report was submitted in September 2014. The objectives of the study were: ? To confirm that cumulative noise emissions from the normal operation of the proposed LM6000 T