Case Study

Gas Processing Plant Expansion

Gas Processing Plant Expansion

CHALLENGE GAS PROCESSING PLANT EXPANSION In 2011, Patching Associates was retained by a major oil and gas operator to complete a Noise Impact Assessment (NIA) for the addition of proposed equipment to an existing compressor station located at a gas processing plant in southern Alberta. The proposed equipment needed to comply with both the o p er at or ’ s internal noise criteria as well as with the Alberta Energy Regulator (AER) Directive 038: No

Join for free to read