Case Study

Lean Engineering Environmental Controls Manufacturer

Lean Engineering Environmental Controls Manufacturer

Pages 1 Pages

Case Study #28 – Lean Engineering Environmental Controls Manufacturer PROJECT PROCESS Issue The cost needed to be lowered on a complex assembly otherwise the product would be moved overseas for assembly. Scope The product took twenty four (24) labor hours to assemble. To keep the product in the U.S., the labor content needs to be less than seven (7) hours. Approach The company used Optima’s “Gated” Assembly Lin

Join for free to read