Case Study
Laboratory Upgrade
Case Study Laboratory Upgrade for Energy Efficiency The Challenge The client, a Global Pharmaceutical Manufacturer had a very high energy demand driven by original heating, ventilation and air conditioning system design and layout with high air change rates and fresh air volumes. The Solution The existing air change rates and fresh air volume were reduced and the client’s plant operational maintenance was improved by opti