Case Study
Kwamnyandu Mall Kwa Mashu, South Africa
The Challenge — The concrete parking deck of the Kwamnyan- du Mall suffered from rain damage and needed to be repaired and protected from further corrosion. The Solution — Five Star ® Waterproofing with Migratory Cor - rosion Inhibitor was specified by Five Star Products’ Licensee, Stoncor Africa. This cementitious waterproofing material ex - hibits very low permeability and excellent resistance to the penetration of chloride ions. Inclusion