Pier Rehabilitation of Nackawic River Bridge
The Challenge — Cost-effectively rehabilitate two deteriorated con- crete piles on the Nackawic River Bridge and further protect them from the damaging effects of ice and floating debris— without the expense and time required to replace them. The Solution — PileForm™ F (FRP) Pile Rehabilitation Jackets. To facilitate placement of the jackets around these very large concrete piles, two-piece 6.35mm (0.25”) thick fiberglass jackets were con -