Case Study
Kentucky Community and Technical Colleges
Project Type: Project Type: Project Type: Project Type: Community College Community College Community College Community College Upgraded Fixtures: Upgraded Fixtures: Upgraded Fixtures: Upgraded Fixtures: 830 830 830 830 Annual Water Savings: Annual Water Savings: Annual Water Savings: Annual Water Savings: 1,713,643 gallons 1,713,643 gallons 1,713,643 gallons 1,713,643 gallons Overall Annual Savings: Overall Annual Savings: Overall Annual Savings: Overall Annual Savings: $25,714 $25,714 $25,714 $25,714 Project Summary: Project Summary: Project Summary: Project Summary: The KCTCS project included 4 campuses of Kentucky’s State Community College system. These campuses located in Danville, Elizabethtown, Owensboro, and Lexington consisted of buildin