Case Study
Kens Commercial Development Post-Tensioned Suspended Slabs
Typical office floors are 2600m 2 of one way slab and band beam construction. Typical floors comprised 180mm slabs spanning 6.6m between 450mm deep x 3000mm wide bond beams spanning 12.3m. Each floor was poured in 4 pours. A total of 812T of PT was used on the project. Edited 2006 VSL NSW has recently completed post tensioning (PT) installation to one of the largest commercial office buildings in Sydney. The A$680 million KENS proje