Case Study

Jubilee Bridge, River Cherwell

Jubilee Bridge, River Cherwell

Pages 1 Pages

When The Morton Partnership wanted to submit designs for a new bridge across the River Cherwell, it commissioned Plowman Craven to assist in the planning process. The 28-metre proposed Jubilee Bridge was required to provide more suitable pedestrian access from Christ Church Meadow through to Christ Church’s sports ground. To ensure that both the planning committee and the public could fully visualise and assess the overal

Join for free to read