Case Study

Interserve Plc Leicester Royal Infirmary

Interserve Plc Leicester Royal Infirmary

New Emergency Department Leicestershire 550 tonnes Project Type Location Steel Tonnage Works Carried Out robinsons.com Structural steelwork, Metal decking, Pre-cast Concrete flooring, Stairs, Lift shaft and Culverts. The project required the structural steelwork and associated sub-trades to be completed within a 12 week programme, whilst ensuring that the “A&E” department was able to function as normal. Robinson took on the responsibility of the lifting and placing of the precast wall and culvert units prior to the steel erection commencing. The structure was on a split level with the main structure being a 2 story column and beam structure with the high level being a single story. The new structure had a close interface with the existing buildings around the perimeter. Access t