Case Study

Instrumentation And Control Design

Instrumentation And Control Design

Pages 1 Pages

Project Overview: This project required MIPAC to undertake all design and control for a Greenfield plant that would process 80,000 tonnes per day. The plant itself is a Copper/Gold mine with a concentrator, 245km slurry pipeline, filter plant & port facilities. The project covered all utilities, including 200km HV power line and freshwater pumping system. MIPAC Scope: ? Client's representative on control system and instrumentation syste

Join for free to read