Case Study
Greenfield Process Control Project
Project Overview: CYMG appointed Glencore Technology to build a new Lead Smelter (ISASMELT™) in Quijing. MIPAC was subsequently appointed to lead the design, implementation and commissioning of the process control system (DeltaV distributed control system and associated Foundation Fieldbus instrumentation). The new lead smelter allows CYMG to increase lead production and comply with all the latest environmental reg- ulations. MIPAC Scope