Case Study
Installing A 1000 kVA Perkins Powered 400V Generating Set In A Dedicated Power Plant Room
CASE STUDY 30 St Mary Axe, London CLIENT: Integrated Health Projects COMMISSION: 1000kVA Perkins powered 400V generator COMMENCEMENT DATE: February 2005 COMPLETION DATE: August 2005 “Broadcrown supplied and installed the generating set including the plant room acoustics and noise attenuation...” For more information on JCB Broadcrown visit broadcrown.com CASE STUDY 30 St Mary Axe, London KEY POINTS • 1000kVA Perkins powered 400V generat