Case Study

Installation Of New Hangar Bridge Crane

Installation Of New Hangar Bridge Crane

Pages 2 Pages

CASE STUDY WWW.ezIQC.COM 855.467.9444 BUY SMART. BUILD BETTER. INSTALLATION OF NEW HANGAR BRIDGE CRANE ALWAYS READY WITH ezIQC® KEY PROJECT FACTORS Time-Sensitive Project, Additions to the Detailed Scope of Work PROJECT SCOPE The scope of work included the following: ¦ Doubling of the existing bridge crane span from 26’ to 52’ ¦ Installation of a new, second bridge crane on the opposite end of the hangar with a bridge span of 52’ and a run

Join for free to read