Case Study

Diamond Hangar

Diamond Hangar

Pages 2 Pages

PULSAR LIGHT CASE STUDY 1 VERSION 1.2 P U L S A R L I G H T 3 Coldhams Business Park, Norman Way, Cambridge CB1 3LH www.pulsarlight.com sales@pulsarlight.com +44 (0) 1223 403 500 · 0 7 9 1 E C N I S · · UK MADE · Stansted Airport’s Diamond Hangar reduces annual running costs by 85% and increases light levels by 2.9x 250 lux 2.9x 90,854 kWh 85% Saving 85% Saving 85% Saving 615,014 kWh 40,474 kg 273,977 kg £11,224 £75,978 After

Join for free to read