Case Study

Riser based coiled tubing intervention executed from a light well intervention vessel.

Riser based coiled tubing intervention executed from a light well intervention vessel.

T otal Intervention Operation handled by L WI vessel (world 1 st ) Riser based coiled tubing intervention executed from a light well intervention vessel. CHALLENGE T o increase production from an existing online subsea well, the client required to conduct saturation logging to identify new zones of interest, to perforate the r elevant zones, and to perform a well cleanout prior to putting the well back on line to minimise any risk of perforati

Join for free to read