After only 18 month’s construction time, a new indoor swimming pool was built near Karlsruhe using the design of the architects Stuttgarter 4a. The modern swimming pool will be used 30 percent by schools, 15 percent by clubs and 55 percent by the general public. The indoor swimming pool is divided into two buildings of dierent heights that interlock at the interface. The smaller building includes the reception area and the changing and shower rooms. It diers from the remaining building by its height and the sheet metal façade. The pool area is in the larger building with a total water surface of 368 m2 and three dierent pools. The indoor swimming pool was developed applying the sustainability criteria for buildings nanced with local public funds. Windows down to ground level and genero