Ketley and Dawley refurbishment scheme on the M54, Telford was undertaken between July 2013 and March 2014. The works required included concrete repairs, bearing instllation and bridge deck improvements. Aquaforce was contracted to carry out hydrodemoltion works on the project. Aquaforce undertook the following: • Removal of pier tops to Ketley East and West central pier bearing shelves • Removal of verge stitching details to Dawley bridge • Removal of concrete for repair of abutments and piers. In addition, Aquaforce was tasked with advising and assisting in the provision of access arrangements and the containment of waste materials produced. This included material being jetted at high pressure and monitorting alkinity of the waste water. Aquafore supplied onsite storage tan